IMTT Building Foundation and Slab

Project Details:

Project Owner: IMTT Inc.
Project Client: IMTT Inc.
Project Cost: approx. $875,000
Project Duration: 4 months

Project Challenges:
  • Active Terminal Facility
  • Coordination with Daily Operations for allowable work to be performed
  • Multiple below grade utilities altered design due to inability to shut down and reroute lines
Work Performed:
  • Excavation
  • Reinforcing Steel
  • Concrete Placement
  • Backfill and Site Restoration to Match Existing