Mill Street Belleville Bridge

Project Details:

Project Owner: Franklin Development Group
Project Client: Franklin Development Group
Project Cost: $863,000
Project Duration: 4 months

Project Challenges

Simpson & Brown enlisted the services of Area Engineering to assist Franklin Development Group in a design-build effort to install a new bridge. With Geotechnical considerations and a logistically challenging site, Simpson & Brown was able to install support of excavation adjacent to an existing roadway and construct a bridge using an Integral Abutment System and Precast Concrete Beams in place of a typical deep foundation and cast-in-place abutment walls.

Work Performed:
  • Support of excavation
  • Additional support of Water Main
  • Excavation and Grading
  • Stone Reventment
  • Below Grade Storm Sewer Holding System
  • Integral Abutment System
  • Precast Concrete Beams
  • Cast-in-Place Parapet Walls and Bridge Deck